Tuesday, January 24, 2012

Bathroom remodel

Here is the progress of the bathroom remodel:

The original bathroom:




The demolition begins:



 oops, found the water line while cutting the shower out.
It's fixed:
 Toilet is out:
Sinks out:

The shower pan is in:


 Durrock is in:

Tile is on the floor:
 Toilet is in, floor is grouted:
Shower is getting tiled:





Layout 6

Ok, finally an update on the layout.

A shot of the full layout:
The yard end of the layout:
The mountain end of the layout:
The mid section of the layout:
Started adding some more scenery:


A gravel road:

Added a few pine trees to the mountain: